NEW SANTAGOSTINO SURGERIES

NUOVI AMBULATORI SANTAGOSTINO

#privatehealthcare The Santagostino Medical Center consists of a network of highly performingspecialist surgeries located in Northern Italy and in Rome, with 50.2 million eurosales, investments of over 6 million, 1300 physicians and a total 239 employeesIn 2022, the holding owning Santagostino was acquired by the Unipolsai insurancegroup, gaining a prominent position on Italy’s private healthcare scene.For the new clinic in via Monviso, and the new via Larga surgery dedicated towomen’s health, Rethink Energy designed the mechanical, electrical and specialinstallations, using heat-pump technology. Place:Milan Type:Hospital Client:Centro Medico Santagostino Year:2020-2023 Surface in sqm:800 – 600

SAN FILIPPO NERI HOSPITAL

OSPEDALE SAN FILIPPO NERI

#safehealthcare Building A of the San Filippo Neri hospital in Rome was completely renovated, withan investment of more than 20 million euro which led to the creation of newdepartments, among which neurology, neonatology, obstetrics andgastroenterology. The new departments of the Roman hospital have advancedmedical equipment and feature modern electrical installations and fire and seismicsystems.Rethink Energy designed the mechanical, electrical and special installations of thenew Intensive and Semi-Intensive Care Units (10 beds each). The facilities wereconceived so as to ensuring optimal functioning both in infectious andimmunosuppressed patients mode, thus granting greater flexibility and thepossibility to use the units in case of a pandemics. Place:Rome Type:Hospital Client:ASL Roma 1 Year:2021 Surface in sqm:800

NEW GALEAZZI HOSPITAL

#thefuturethatheals The new Galeazzi-Sant’Ambrogio IRCCS (research) Hospital was built inside Rho Fiera’s MIND area (Milano Innovation District). The complex represents a model for Italy’s future hospitals, and is founded on the tight integration between care, research and training.   Numbers are impressive: 180.000 sqm of modern architectural concepts; 94 mt height (among Europe’s 8 tallest hospitals, and the world’s 75 tallest), 16 floors above ground; 30.000 sqm parking space and more than 600 beds.   Rethink Energy developed the new, advanced management and consumption-forecast system for the hospital’s heating/cooling plant. The control system can precisely forecast the energy consumption and select the most convenient sources, based on actual hourly cost acquired in a dynamic mode. Also, the system can monitor energy production units to compare actual performance with that declared by the supplier of the equipment.   The plant can supply 12MW in cooling and 8MW in heating with steam boilers, centrifugal compressor cooling units, heat recovery heat-pumps, district heating, steam cogeneration.   The new hospital was built making the best use of the most advanced solutions in terms of energy savings and environmental sustainability, reducing waste and noise-pollution levels to an absolute minimum. The hospital can apply for Gold V4 LEED certification for environmental sustainability also thanks to Rethink Energy’s mindful planning and design. Place:Milan Type:Hospital Client:RTI Edile GSK Year:2021-2023 Surface in sqm:30.000