Rethink Energy developed the preliminary MEP design study for the new digital infrastructure for an hyperscale data ceter in Genova. The project includes four independent modules, with a total installed power of approximately 20 MW, designed with a focus on scalability, reliability, and long-term sustainability. The study assessed strategies for cooling systems, electrical distribution, fire protection, and energy management, aligned with Tier III and Tier IV data center design standards. The goal was to ensure modular operability, optimized performance, and full system redundancy, within an architectural and environmental framework well integrated into the urban context of Genoa.